Building a deck in your backyard can provide you and your family with a place to gather and enjoy spending time outside.

Many times, decks are attached to the house, but this can be a complicated process, as you’ll have to remove siding from your home and make a secure connection between the deck and the house.

Another option is to construct a deck that isn’t attached to the house, using a concrete post in each corner to support it.

Things You'll Need:
  • Tape measure
  • Spray paint
  • Shovel
  • Augur
  • Waxed-fiber tubes
  • Plastic footers
  • Level
  • Utility knife
  • Concrete
  • Trowel
  • 2-by-6 boards
  • Circular saw
  • Paintbrush
  • Safety goggles
  • Hammer
  • Galvanized nails
  • 1-by-4 board
  • Post bases
  • Hammer drill
  • Anchor bolts
  • Impact wrench
  • Galvanized angle brackets
  • Galvanized screws
  • Galvanized joist hangers
  • Decking boards
  • Waterproofing agent

So let’s dive into it steps of building a deck with four concrete posts.

Instructions to Building a Deck With Four Concrete Posts:

Here is the instruction for building a deck with four concrete posts.

Installing the Posts:

How to Build a Deck With Four Concrete Posts

These are instruction steps to install the posts.

Step 1:

Measure and mark the outline of the deck onto the ground with spray paint.

Step 2:

Dig a hole into the ground at each corner of the deck for the posts.

Use an augur if the holes are more than 1-foot deep.

Make the holes slightly wider than the plastic footings for the posts.

Dig the holes deep enough to go beneath the frost line.

Depending on your location, the frost line can be several feet deep in a cold climate, or a few inches in a warmer climate.

Your local zoning board can provide you with the depth of the frost line in your area.

Step 3:

Insert the waxed fiber tubes for the posts into the plastic footers.

The footers create a wide base, which prevents the posts from sinking into the ground.

Step 4:

Place the tubes into the holes, and check them for level.

Adjust the tubes if needed, and backfill the dirt around them.

Keep the level of the tube as you fill the holes.

Step 5:

Cut the tubes to the height that you want the posts to extend above the ground, using a utility knife.

Step 6:

Place a plastic footing upside-down into each tube.

This makes it easier to pour the concrete, as upside-down footings act as a funnel.

Step 7:

Fill the tubes and footings with concrete, working a shovel inside the concrete every 8 to 10 inches to remove any air bubbles trapped inside the concrete.

Step 8:

Take the plastic footers off of the top of the tubes, then smooth the concrete with a trowel.

Allow the concrete to set for the time specified on the packaging.

Step 9:

Cut off the excess tubing with a utility knife, if desired.

How to install decking posts

Watch this video of how to install decking posts.

So, we hope you find these steps and video of installing the posts helpful.

Now let’s dive into it steps for building a deck.

Building the Deck:

How to Build a Deck With Four Concrete Posts

These are instruction steps to building a deck.

Step 10:

Cut 2-by-6 boards for the outer frame of the deck, using two boards on each side of the deck.

Wear safety goggles when sawing the wood.

Step 11:

Nail the two boards you cut for each side of the deck together with galvanized nails so that the outer edge of the frame is doubled up.

Step 12:

Nail the outer deck boards together to fit the outline of the deck, using galvanized nails.

Step 13:

Place the framing on top of the concrete posts and check it for square by measuring diagonally across the framing in both directions.

If the measurements differ, cut a spacer from a 1-by-4 board and place it inside the framing.

Check the measurements again, and move the spacer as needed to make the frame square.

Step 14:

Mark the outer edges of the deck frame onto the concrete posts, then remove the framing.

Step 15:

Place a post base on top of each post, aligning it with the outer edges of the framing.

Mark the post base hole onto the concrete, then remove the post base.

Drill a pilot hole into the posts with a hammer drill.

Place the post base back into position, then slide an anchor bolt into the hole.

Tighten the anchor bolts with an impact wrench.

Step 16:

Screw galvanized angle brackets to the inside edges of the corners with galvanized screws.

This strengthens the corners.

Step 17:

Nail galvanized joist hangers to the inside edges of the framing where you’re installing the joists for the floor of the deck.

Place the joist hangers no more than 1 foot apart.

Step 18:

Cut the joists from 2-by-6 boards.

Place the joists inside the joist hangers, and drive galvanized nails through the joist hangers and into the joists.

Step 19

Measure the length of the platform — perpendicular to the joists– and cut decking boards to fit.

Step 20

Screw the decking boards to the joists and outer frame with galvanized screws.

Step 21

Apply a waterproofing agent to the deck, following the manufacturer’s instructions, and allow it to dry.

Place the deck into position on the posts, and attach the outer frame to the post bases with galvanized screws.

Read Also: Backyard Wood Deck Cleaning & Maintenance Tips

Tips & Warnings:

Consult your local zoning board before constructing the deck, to learn the building codes you must follow and acquire any permits you might need.

Final Words

So we hope you find these steps helpful and give you some valuable tips about how to strip & finish a deck. If you find this article helpful then you can share it with others or pin it for later.

{PIN IMAGE}

If you have any suggestions or questions for us, Then you can comment below or visit the questions page and let us know about your feedback.

Your feedback is very valuable for us, So don’t forget to share it.

Finally, Thank you for spending time with us, Cheers!

#Easy Backyard Ideas

Leave a Comment